Feasibility Study: Transregio Feleac TR35 Road – Metropolitan and connecting roads

The route of the metropolitan TR35 separates from the DN1 National Road at km 498+390 on the right side, at the border between Căpușul Mare and Gilău communes. Crossing the countryside of Gilău commune, Cluj-Napoca municipality and Apahida commune. The route closes in the northwest part of the inner city of the Apahida commune, on the section of the Bypass Cluj East-Apahida-Vâlcele (DN 1 N) and continues to the east until the intersection with the DN 1C road (Câmpenești area).

This project sought to integrate the future development of the Cluj-Napoca metropolitan area, in correlation with the major investment projects being prepared by the state institutions at the national and regional level.

Feleac transregio road includes two components with a total length of 74,457 km:
– Metropolitan TR35 with a length of 42,13 km
– Link roads with a length of 32,327 km

The two components are connected by means of 20 road junctions. The length of the braces related to road junctions is 26,620 km

Throughout the length of the project we have a total number of 161 works of art:
– Bridges, Passages, Viaducts: 148 pcs.
– Bridges, Passages, Viaducts: 8pcs.
– Tunnel: 5pcs.

The feasibility study has been completed.